Schema: addithive-agent-record/v1.1 · Record type: bottleneck · Valid as of: 2026-08-12
{
"affected_steps": [
"material qualification",
"machine qualification",
"process qualification",
"part qualification",
"supplier qualification",
"production control"
],
"bottleneck_layer": "qualification_and_certification",
"canonical_url": "https://addithive.com/how-aerospace-additive-manufacturing-qualification-works/",
"claims": [
{
"claim": "Addithive's qualification guide defines qualification as proof that material, machine, process, site and part design can repeatedly meet requirements.",
"claim_type": "fact",
"confidence": "high",
"evidence": [
"source:qualification-guide"
]
},
{
"claim": "Qualification can be slower than printing innovation and can be part-specific rather than automatically transferable.",
"claim_type": "analysis",
"confidence": "high",
"evidence": [
"source:bottleneck-map",
"source:qualification-guide"
]
},
{
"claim": "Machine, material, site and parameter changes can require requalification or partial requalification.",
"claim_type": "fact",
"confidence": "high",
"evidence": [
"source:qualification-guide"
]
}
],
"failure_modes": [
"insufficient material allowables",
"process drift",
"software or parameter changes",
"inspection-method gaps",
"part-specific evidence burden",
"customer or regulator approval delay"
],
"id": "addithive:bottleneck:qualification-certification",
"last_verified": "2026-08-29",
"name": "Qualification and Certification",
"record_type": "bottleneck",
"record_url": "https://addithive.com/2026/08/12/agent-bottleneck-qualification-certification/",
"relationships": [
{
"from": "qualification",
"relation": "converts",
"to": "technical capability into production permission"
},
{
"from": "configuration changes",
"relation": "may_trigger",
"to": "requalification"
},
{
"from": "part criticality",
"relation": "increases",
"to": "evidence burden"
}
],
"research_use_only": true,
"schema": "addithive-agent-record/v1.1",
"sources": [
{
"id": "source:qualification-guide",
"url": "https://addithive.com/aerospace-additive-manufacturing-qualification-guide/"
},
{
"id": "source:bottleneck-map",
"url": "https://addithive.com/additive-manufacturing-bottleneck-map/"
}
],
"summary": "Qualification converts AM capability into permission to produce. It links material, machine, process, post-processing, inspection, part performance and production control into an accepted evidence package.",
"valid_as_of": "2026-08-12",
"why_it_matters": "A technically printable part cannot become a controlled production route until the relevant evidence package is accepted and maintained through change control."
}Related canonical answers
Aerospace Qualification · Production-Ready AM Parts · Real Bottleneck in Metal AM · Evidence Standard
